Kinder Morgan Energy Partners increases ownership stake to 100% in El Paso Natural Gas Pipeline and Midstream assets

Monday, March 4, 2013
  • The transaction is expected to be immediately accretive to cash available for distribution to KMP unitholders.
  • KMP purchased the assets at about eight times 2013 EBITDA.

Kinder Morgan Energy Partners, L.P. (NYSE: KMP) announced that it has completed the previously announced acquisition (drop down) of 50 percent of El Paso Natural Gas Company, L.L.C. (EPNG) and 50 percent of former El Paso Midstream assets in Utah and South Texas from Kinder Morgan, Inc. (NYSE: KMI). The transaction has a total value of approximately $1.655 billion, including approximately $560 million of proportional debt at EPNG. The transaction is expected to be immediately accretive to cash available for distribution to KMP unitholders. KMP now owns 100 percent of both EPNG and the midstream assets. The transaction, which closed and is effective March 1, was approved by the independent boards of both KMI and Kinder Morgan Management, L.L.C. (NYSE: KMR).

KMP purchased the assets at about eight times 2013 EBITDA. KMP funded 10 percent of the transaction value, net of debt assumed, with KMP units valued at approximately $110 million that were issued to KMI at closing. The remaining value was funded with cash. KMI intends to use the proceeds from the dropdown to pay down debt that was associated with the May 2012 purchase of El Paso Corporation.

EPNG is a 10,200-mile pipeline system with a design capacity of about 5.6 billion cubic feet per day (Bcf/d) of gas. It transports natural gas from the San Juan, Permian and Anadarko basins to California, other western states, Texas and northern Mexico. EPNG has up to 44 Bcf of working natural gas storage capacity.

The midstream assets include Altamont gathering, processing and treating assets in the Uinta Basin in Utah and the Camino Real gathering system in the Eagle Ford shale in South Texas. The Altamont System has over 1,200 miles of pipeline infrastructure, over 450 well connections with producers, and it operates a processing plant with a design capacity of over 60 million cubic feet per day (MMcf/d) of gas being expanded to 80 MMcf/d and a 5,600 barrel per day (bpd) natural gas liquids fractionator. The Camino Real Gathering System has 150 MMcf/d of gas gathering capacity and 110,000 bpd of oil gathering capacity.

In connection with the transaction, BofA Merrill Lynch provided certain financial advisory services to the board of directors of Kinder Morgan, Inc. Greenhill & Co., LLC provided certain financial advisory services to the conflicts and audit committee of the board of directors of Kinder Morgan G.P., Inc. and Kinder Morgan Management, LLC.

This article is for information and discussion purposes only and does not form a recommendation to invest or otherwise. The value of an investment may fall. The investments referred to in this article may not be suitable for all investors, and if in doubt, an investor should seek advice from a qualified investment adviser. More

Related News

Join 70,000 other oil and gas professionals

Network with others, build your profile, and receive the latest oil and gas news in your inbox. It's free!

Your details are never shared or sold. We hate spam too.

» More Jobs       » Upload a free Job       » Upload your CV

  • Development Geologist

    Salary £80000 - £120000 per annum   |   Science (other)  |  Trondheim, Norway

  • Draughter

    Salary £25000 - £35000 per annum + competitive   |   Engineer - Design & Construction  |  Scotland, Aberdeen

  • Piping Engineer

    Salary negotiable   |   Engineer - Design & Construction  |  France

  • Fabricator/Welder

    Salary £12 - £14 per hour + PPE   |   Engineer - Petroleum  |  England, Hertfordshire, Hemel Hempstead

  • Installation Engineer (Pipeline Shallow Water)

    Engineer - Design & Construction  |  France, Isle of France, Paris

  • Service Engineer

    Salary To be discussed   |   Engineer - Maintenance  |  England, London, North West London

More Europe Jobs

More Global Jobs

Opinion & Commentary

  • Eight pieces of our oil price predicament
    A person might think that oil prices would be fairly stable. Prices would set themselves at a level that would be high enough for the majority of producers, so ...

» More Opinion & Commentary         » Write for us             RSS RSS

Oil & Gas Training

Mastering 4D Seismic
Ian Jack, London, 06 Nov 2014

Petroleum Geology of West Africa
Duncan Macgregor, London, 12 Nov 2014

Introduction to Contingency Planning: The value to oil and gas companies in high-risk areas
Mark Theobald, London, 18 Nov 2014

All Upcoming Training


Opinions & Commentary

Flash blog, Oil price, BG

by Malcolm Graham-Wood

Read More »